case: ISE, 2016 (ENTRANCE)


ISE, 2016 (ENTRANCE)


Specification
- Total square – 20 m²
- Energy consumption – 25 kW
- Time for assembly – 7 h
- Time for disassembly – 4 h
- Special features:
-
- giant letters “ISE” 2.3 m high composed of LED module
- LED display in the shape of a heart to the left of «ISE» letters
- "heart" modules turned at an angle of 45° relative to the background
Equipment in other projects
Related projects



